Buyers budget for the flat price and get surprised by everything else. Across our three states, the everything-else runs 6% to 13% of agreement value. Here is the full list.
Stamp duty and registration by state
| State | Stamp duty | Women buyers | Registration |
|---|---|---|---|
| Maharashtra (Navi Mumbai, Mumbai, Thane) | 6% | 5% | 1%, capped ₹ 30,000 |
| Karnataka (Bengaluru) | 5% above ₹ 45 L | Same | 1% + 0.5% cess |
| West Bengal (Kolkata) | 4% – 6% by value and location | Same | 1% |
Maharashtra's 6% comprises 5% base duty plus 1% local body tax. The 1% concession for women buyers applies when the property is registered in a woman's sole name or jointly with only women — a genuine saving of ₹ 1.5 lakh on a ₹ 1.5 crore flat.
Karnataka adds a 0.5% cess that buyers routinely forget. West Bengal's rate varies by property value and by whether the property is urban or rural.
GST — the same everywhere
- Under-construction: 5% with no input tax credit.
- Ready with occupancy or completion certificate: nil.
- Affordable housing (under ₹ 45 lakh, within carpet-area limits): 1%.
- Commercial: 12% with input tax credit available.
That 5% is the single strongest argument for buying ready inventory, and it is routinely left out of comparisons between a ready flat and an under-construction one.
The charges nobody quotes upfront
- Society formation and share money: ₹ 15,000 to ₹ 30,000
- Legal and documentation: ₹ 25,000 to ₹ 60,000
- Advance maintenance: usually 12 to 24 months collected at possession
- Sinking fund or corpus: often ₹ 50 to ₹ 150 per sq.ft., one time
- Floor rise: ₹ 50 to ₹ 250 per sq.ft. per floor above a base level
- Preferred location charges: 2% to 5% for corner, park-facing or creek-facing units
- Infrastructure and development charges: frequently ₹ 100 to ₹ 250 per sq.ft.
- Utility connections: ₹ 40,000 to ₹ 90,000
- Home loan processing: 0.25% to 0.50% of the sanctioned amount
Worked example: ₹ 1.5 Cr under-construction flat in Navi Mumbai
| Item | Amount |
|---|---|
| Agreement value | ₹ 1,50,00,000 |
| Stamp duty at 6% | ₹ 9,00,000 |
| Registration (capped) | ₹ 30,000 |
| GST at 5% | ₹ 7,50,000 |
| Corpus at ₹ 100/sq.ft. on 900 sq.ft. | ₹ 90,000 |
| Legal and documentation | ₹ 45,000 |
| Society formation | ₹ 25,000 |
| Advance maintenance (18 months) | ₹ 72,000 |
| Utility connections | ₹ 65,000 |
| Loan processing (0.35% on ₹ 1.2 Cr) | ₹ 42,000 |
| Total outflow | ₹ 1,70,19,000 |
That is 13.5% above the headline price — higher than the usual rule of thumb because GST applies. On ready inventory the same flat totals about ₹ 1.62 Cr.
What to do about it
Register in a woman's name where possible and save 1% in Maharashtra. Compare ready and under-construction on total outflow rather than agreement value. And get the line-item working in writing from the developer before you pay the booking amount — we ask for it on every transaction we handle.
Want this run on your own shortlist?
Send us the projects you are considering and we will score all seven parameters, with the registered transaction data behind each score. You get the report whether or not you transact with us.
Get my seven-parameter report